EV Charging Centre
Specialist Installers Of Domestic EV Charging Points
Installation In Pictures

This page shows the stages of installation of a free chargepoint installed at a customer's house under the OLEV Domestic Chargepoint Grant Scheme.

The consumer unit (fuse box) and exterior wall before installation begins:




The installer drills out of the back of the consumer unit to feed a cable to the Chargepoint:



The Chargepoint is located on the wall and a junction box installed:



Conduit installed on the exterior (and interior should any internal wiring be required):



The Chargepoint is connected to the consumer unit:



The consumer unit and installation location after the free chargepoint installation has been completed:



The Chargepoint connected and fully operational: